Footing

45 Main St S, Brampton

Everything the City of Brampton has published for this address: 23 building permits and 3 development applications, 2007–2026. No company named as builder on any permit here.

23building permits
3development applications
disclosed value (0 of 23 disclosed)
2026-09-16latest activity

View on mapThis street: Main St SCity's permit dataset ↗

Builders and applicants (companies only)

Companies as the City published them. Owner-builders (private individuals) are withheld by Footing's policy — the permit reads "individual — name withheld".

Timeline (Footing's count)

YearPermitsApplicationsDisclosed value
20267
20255
20241
202321
20221
202101
20201
20191
201811
20151
20121
20111
20071

Building permits (23)

DatePermitStatusValueBuilderLinks
2026-09-16New construction · Other*New · Temporary Tent · New · Temporary TentIssuedn/dRecord · City
2026-08-13New construction · Other*New · Temporary Tent · New · Temporary TentIssuedn/dRecord · City
2026-07-24New construction · Other*New · Temporary Tent · New · Temporary TentIssuedn/dRecord · City
2026-07-16New construction · Other*New · Temporary Tent · New · Temporary TentClosedn/dRecord · City
2026-06-24New construction · Other*New · Temporary Tent · New · Temporary TentIssuedn/dRecord · City
2026-06-05New construction · Other*New · Temporary Tent · New · Temporary TentClosedn/dRecord · City
2026-05-19New construction · Other*New · Temporary Tent · New · Temporary TentAppliedn/dRecord · City
2025-09-04New construction · Other*New · Temporary Tent · New · Temporary TentAppliedn/dRecord · City
2025-08-29New construction · Other*New · Temporary Tent · New · Temporary TentClosedn/dRecord · City
2025-07-25New construction · Other*New · Temporary Tent · New · Temporary TentClosedn/dRecord · City
2025-07-17New construction · Other*New · Temporary Tent · New · Temporary TentClosedn/dRecord · City
2025-05-30New construction · Other*New · Temporary Tent · New · Temporary TentClosedn/dRecord · City
2024-08-27Renovation · Plumbing & sprinklers*Alteration (Renovation) · Plumbing Piping · Alteration (Renovation) · Plumbing PipingIssuedn/dRecord · City
2023-12-19RenovationRevision · A4: Amusement Park Structures · Revision · A4: Amusement Park StructuresIssuedn/dRecord · City
2023-05-26New construction · Other*New · Temporary Tent · New · Temporary TentDeemed Abandonedn/dRecord · City
2022-05-02RenovationAlteration (Renovation) · A4: Amusement Park Structures · Alteration (Renovation) · A4: Amusement Park StructuresIssuedn/dRecord · City
2020-08-14RenovationAlteration (Renovation) · Site Service Com/Ind/Inst · Alteration (Renovation) · Site Service Com/Ind/InstIssuedn/dRecord · City
2019-05-24New construction · Other*New · Temporary Tent · New · Temporary TentClosedn/dRecord · City
2018-05-25New construction · Other*New · Temporary Tent · New · Temporary TentClosedn/dRecord · City
2015-06-22New construction · Other*New · Temporary Tent · New · Temporary TentDeemed Abandonedn/dRecord · City
2012-05-11New constructionNew · Permanent · New · PermanentClosedn/dRecord · City
2011-03-15Renovation · Plumbing & sprinklers*Alteration (Renovation) · Plumbing Piping · Alteration (Renovation) · Plumbing PipingClosedn/dRecord · City
2007-05-15New construction · Other*New · Temporary Tent · New · Temporary TentClosedn/dRecord · City

Permit column: the City's permit type, work and structure type as published and its description. "n/d" = not disclosed: the City left the value blank. "Withheld" = the City named a builder who appears to be a private individual. City links go to the City of Brampton's permit dataset (City of Brampton GeoHub).

Development applications (3)

SubmittedApplicationStatus
2023-07-19Site plan SPA-2023-0088Ice rink replacement, power upgrades (electrical power posts and cabinets), walkway resurfacing. · applicant: NGA ArchitectsSite Plan ApprovedRecord · City dataset ↗
2021-11-03Site plan SPA-2021-0226Demolish and replace existing ice rink concrete pad and its embedded refrigeration piping and replace with new. The perimeter of the ice rink concrete pad is noSite Plan ApprovedRecord · City dataset ↗
2018-11-28Site plan SP18-143.000To remove existing playground, wading pool and swings, and install of a new splash pad, playground and trellis. · applicant: THE CORPORATION OF THE CITY OF BRAMPTONSite Plan ApprovedRecord · City dataset ↗

The City of Toronto publishes the assigned planner as the file contact, never the developer; Footing does not show planner contact details here.

New permits near here, every Monday

One plain email a week: permits issued and applications submitted around 45 Main St S, Brampton, in your trade if you pick one. From footing@signalindex.ca. Double opt-in; one-click unsubscribe.

We store your email, the point and radius, your trade if you gave one, and when you signed up — nothing else, never sold. * "Trade" is Footing's reading of each City's permit types, not a City category.

Source: City of Brampton GeoHub — permits and, where the City publishes one, development applications, loaded nightly. The City of Brampton names a builder or contractor on about 40% of permits. "Not disclosed" means the City left the field blank (or wrote 0 or placeholder text for cost). Coordinates are the City's address point, not a survey of the works. Grouping by address is Footing's join on the normalized street address.