Footing

526 Winona Rd, Hamilton

Everything the City of Hamilton has published for this address: 0 building permits and 4 development applications, 2022. No company named as builder on any permit here.

0building permits
4development applications
disclosed value (0 of 0 disclosed)
2022latest activity

View on mapThis street: Winona RdCity's permit dataset ↗

Building permits (0)

No permits.

Development applications (4)

SubmittedApplicationStatus
2022Rezoning / OPA ZAC-22-015To permit two 24-storey multiple dwellings, two 15-storey multiple dwellings, two 4-storey stacked townhouse blocks, and five 2-storey townhouse blocks (1212 unRecord · City dataset ↗
2022Rezoning / OPA UHOPA-22-007To re-designate the subject lands to Medium Density Residential 3 within the Urban Lakeshore Area Secondary Plan and to establish a site-specific policy to alloRecord · City dataset ↗
2022Application FC-22-002To develop two 24-storey residential buildings, two 15-storey residential buildings, two 4-storey stacked townhouse blocks and five 2-storey townhouse blocks foRecord · City dataset ↗
2022Site plan DA-22-154To develop two 24-storey and two 15-storey multiple dwellings, 5 blocks of 2-storey townhouse dwellings, one 4-storey multiple dwellings and one 2-storey amenitRecord · City dataset ↗

The City of Toronto publishes the assigned planner as the file contact, never the developer; Footing does not show planner contact details here.

New permits near here, every Monday

One plain email a week: permits issued and applications submitted around 526 Winona Rd, Hamilton, in your trade if you pick one. From footing@signalindex.ca. Double opt-in; one-click unsubscribe.

We store your email, the point and radius, your trade if you gave one, and when you signed up — nothing else, never sold. * "Trade" is Footing's reading of each City's permit types, not a City category.

Source: Open Hamilton — permits and, where the City publishes one, development applications, loaded nightly. The City of Hamilton publishes no builder, contractor or construction value; its permit tables were last refreshed in January 2024. "Not disclosed" means the City left the field blank (or wrote 0 or placeholder text for cost). Coordinates are the City's address point, not a survey of the works. Grouping by address is Footing's join on the normalized street address.